 | India’s opts for caution on return to launch pad
31 March 2011
After two failures of its heavy lift Geosynchronous Satellite Launch Vehicle (GSLV) in
April and December last year, India is taking a cautious approach to resuming launch
operations of the vehicle, delaying a planned first-quarter mission for its workhorse
Polar Satellite Launch Vehicle (PSLV).
The Indian Space Research Organisation (ISRO) says a PSLV launch schedule is
awaiting tests of the high-temperature tolerance level of a key component of the
vehicle.
News content on this website, where abstracts are taken from full articles elsewhere, are assumed public domain. All uncredited images are assumed as public domain with the exception of logos which are generally trademarks of the organisation whose materials are cited.
|  |