 | NASA prepares for green run testing, practices lifting SLS Core Stage
31 August 2019
NASA cleared a milestone in preparation for Green Run testing of its Space Launch
System (SLS) core stage with an Aug. 23/24 lift and installation of the core stage
pathfinder simulator onto the B-2 Test Stand at Stennis Space Center near Bay St. Louis,
Mississippi.
News content on this website, where abstracts are taken from full articles elsewhere, are assumed public domain. All uncredited images are assumed as public domain with the exception of logos which are generally trademarks of the organisation whose materials are cited.
|  |